The construction project of Shanhai Road, an urban expressway, is the first expressway after the release of the "12335" policy plan in Yantai. It is of great significance to improve the quality of urban functions and enhance the radiation and driving capacity of the central urban area. The project starts from the south of Tashan Tunnel in the north and ends at Lustar Road in the south, with a total length of 5.624km. The whole line is in the form of elevated+ground auxiliary road.
The project adopts the "temporary support erection and hoisting method" independently developed by the company for the first time, which greatly improves the on-site construction efficiency, shortens the support construction time, reduces the consumption of turnover materials, and has been unanimously recognized and highly praised by the owner!
تم إرساله بنجاح
سوف نتصل بك في أقرب وقت ممكن