Curtain wall is the exterior wall enclosure of a building, which does not bear weight and is hung like a curtain, so it is also called "curtain wall". It is a light wall with decorative effect commonly used in modern large and high-rise buildings.
Contact Now
Steel structure is a natural fabricated structure, but not all steel structures are fabricated buildings, especially not good fabricated buildings. So what kind of steel structure building can be considered as a good prefabricated building?
Contact Now
Basic InstructionThe complete process supervision and inspection of the assignment changed into completed with the aid of the international well-known bureau veritas. the layout, production and full assembly offerings of guoshun organization had been evaluated as "very glad" by using the owner icafal ingenier í a y constructi ó n s.a. (the 6th largest standard contractor in chile and rated because the countrywide champion of chilean creation sustainable development business enterprise through the chilean residence of representatives).Site Display
Contact Now
Basic InstructionThe whole process supervision and inspection of the project was completed by the international well-known bureau veritas. The design, production and full assembly services of Guoshun group were evaluated as "very satisfied" by the owner icafal Ingenier í a Y constructi ó n S.A. (the sixth largest general contractor in Chile and rated as the national champion of Chilean construction sustainable development company by the Chilean house of Representatives).Site Display
Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
Contact Now
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
Contact Now
IntroductionSteel bridge is a bridge whose main bearing structure is steel, i.e. steel structure bridge and steel bridge. Fabricated steel bridges have been widely used all over the world. The original fabricated steel bridge was designed by British engineer Donald Bailey at the beginning of World War II in 1938. The main design concept is to assemble the fabricated steel bridge with the least kinds of unit components, which can bear various loads and different spans, and only need to be transported by general medium-sized trucks. In special cases, it can be built entirely by manpower
Contact Now
Steel frame bridge is a bridge whose main bearing structure is steel, i.e. steel structure bridge and steel bridge. Fabricated steel bridges have been widely used all over the world. The original fabricated steel bridge was designed by the British engineer Donald Bailey at the beginning of the Second World War in 1938. The main design concept is to assemble the assembled steel bridge with the least types of unit members, which can bear various loads and different spans, and only need to be transported by ordinary medium-sized trucks.
Contact Now
IntroduceMetallic structure platform is a structural platform composed of metal material, which is one of the primary types of building structure of the platform.the shape is especially composed of steel beam, metal column, metallic truss and different additives fabricated from type steel and metal plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and different rust elimination and rust prevention generation.welds, bolts or rivets are commonly used between the individuals or additives.because of its mild weight and simple construction, it's mil
Contact Now
Basic InstructionAccording to executive director Sun Deshan, the international trade business of Guoshun group has become one of the "troikas" in parallel with the main environmental protection industry of air pollution control and the green fabricated steel structure construction industry. In the international market, it mainly undertakes steel structure engineering projects and flue gas treatment projects, especially steel structure engineering projects.
Contact Now
Another advantage of prefabricated steel structures is their versatility in design. Steel allows for flexible architectural designs, enabling the creation of unique and visually appealing stadiums. The use of steel also ensures column-free spaces, providing unobstructed views for spectators and maximizing seating capacity.Additionally, the use of prefabricated steel structures reduces construction waste and promotes sustainability. The steel components are fabricated with precision, minimizing material wastage.
Contact Now
InstructionFlue gasoline desulfurization and denitration technology is a boiler flue fuel purification technology carried out to the chemical industry of multi nitrogen oxide and sulfur oxide generation. nitrogen oxides and sulfur oxides are one of the principal assets of air pollutants. consequently, the application of this era has many advantages for ambient air purification.
Contact Now
Basic InstructionWe have a valid gadget of qualifications, the present metallic shape engineering contracting qualification (Level I), metallic shape production and set up qualification (Level I), mild metallic shape engineering layout qualification (Grade A), mechanical and electric creation wellknown contracting qualification (Level I), environmental engineering contracting qualification (Level I) etc., in general with 20 qualifications.Steel construction projectTanzania steel bridgeSteel projects in China
Contact Now
IntroduceFlue gasoline desulfurization and denitration era is a boiler flue gas purification technology implemented to the chemical enterprise of multi nitrogen oxide and sulfur oxide era. nitrogen oxides and sulfur oxides are one of the predominant resources of air pollution. therefore, the utility of this era has many benefits for ambient air purification.
Contact Now
InstructionImportant heating, iron and metal businesses and thermal strength flowers in town iciness are huge-scale coal-fired manufacturing, which has grow to be the supply of air pollutants. in state-of-the-art years, all localities have adopted energetic environmental protection pointers.
Contact Now
On April 20, the closing ceremony of the Tanzanian new WAMI bridge built by Chinese enterprises was held in msata city. Chinese ambassador to Tanzania chenmingjian and Tanzanian Minister of national engineering makamembalawa attended the ceremony. The new WAMI bridge is 310 meters long and 11.85 meters wide. It is a two-way single lane bridge across both banks of the WAMI river., In sharp contrast to the old WAMI bridge not far away.
Contact Now
Basic InstructionAccording to the relevant person in charge of the South extension project of Shunhe expressway, the South extension of Shunhe expressway will realize multi-level and full coverage of BRT + rail transit + ordinary bus + tourist bus, maximize the high-quality road resources, tilt to slow and public transport, make public transport travel more convenient, give priority to public transport signals, implement green wave traffic, intelligent monitoring of the whole line, and use information technology to improve traffic management level and travel service level.
Contact Now
Function, appearance and practical value are the standards that people use when choosing building materials.
Contact Now
Assembled steel structure:Assembled steel structure, also known as modular steel structures, offer several advantages in the field of construction. The detailed advantages of Assembled steel structure in buildings are as follows: pre-assembled in a factory-controlled environment, allowing for faster construction.
Contact Now
Benefits of Interarch steel framing for Educational Buildings1.Flexibility in construction and aesthetic look2.Large grid span as per class room requirement.3.Low lifetime maintenance cost and durability.4.Easily expandable for growing need with the time.5.Faster construction resulting early occupancy.
Contact Now
Basic InstructionShandong GuoShun International trade co., ltd. AND Afghan ARYANA NAWEEN BERADRAN CONSTRUCTION AND ROAD BUILDING COMPANY AFN ACCT signed a contract for the steel structure Bridges on June 22, 2018.
Contact Now
Basic InstructionRonald lwakatare, chief govt of tanzania's speedy transit authority, stated they'd received $148.1 million for section iii and $99.9 million for section iv. "the funds obtained will make contributions to the actual production of brt infrastructure, and the government might be answerable for compensating people who will be tormented by the project," he stated.Under Construction
Contact Now
Basic InstructionRonald lwakatare, chief govt of tanzania's speedy transit authority, stated they'd received $148.1 million for section iii and $99.9 million for section iv. "the funds obtained will make contributions to the actual production of brt infrastructure, and the government might be answerable for compensating people who will be tormented by the project," he stated.Under Construction
Contact Now